The National High-Speed Rail Corporation Limited (NHSRCL) has opened technical bids for the design and construction of 237 km length of mainline for Mumbai- Ahmedabad High-Speed Rail corridor.
The technical bids are related to one of the biggest tenders covering 47 percent of MAHSR alignment and four stations.
This tender covers about 47 percent of the total alignment of 508 km, between Vapi and Vadodara in the state of Gujarat.